Potter-Gold substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AC1-187 Potter-Gold 115kV 115 15 Wind Withdrawn
T121 Potter Wind Farm 115 15 Wind Withdrawn
Y1-032 Potter-Gold 115kV 115 12.9 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.