Gold-Sabinsville substation interconnection queue
2 active projects totalling 17.1 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
17.1active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Q24 | Gold-Sabinsville 115kV | 115 | 20 | Wind | Withdrawn |
| Z1-069 | Big Level Wind Farm | 115 | 13.3 | Wind | In Service |
| N36 | Gold Sabinsville | 115 | 10 | Wind | Withdrawn |
| AB1-160 | Big Level Wind Farm | 115 | 3.8 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.