Gold-Sabinsville substation interconnection queue

2 active projects totalling 17.1 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
17.1active MW
4total filed
Queue IDProjectkVMWResourceStatus
Q24 Gold-Sabinsville 115kV 115 20 Wind Withdrawn
Z1-069 Big Level Wind Farm 115 13.3 Wind In Service
N36 Gold Sabinsville 115 10 Wind Withdrawn
AB1-160 Big Level Wind Farm 115 3.8 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.