Gold-Sabinsville substation interconnection queue
2 active projects totaling 17.1 MW in the PJM queue, plus 2 with terminal status (shown grayed).
4 PJM queue filings name Gold-Sabinsville as the point of interconnection, all in Potter County, PA.
Target commercial operation dates as filed run from Dec 2010 to Oct 2019 (4 filings).
2active projects
17.1active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Q24 | Gold-Sabinsville 115kV | 115 | 20 | Wind | Withdrawn | Dec 2010 |
| Z1-069 | Big Level Wind Farm | 115 | 13.3 | Wind | In Service | Oct 2019 |
| N36 | Gold Sabinsville | 115 | 10 | Wind | Withdrawn | Dec 2014 |
| AB1-160 | Big Level Wind Farm | 115 | 3.8 | Wind | In Service | Oct 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Potter County, PA
- Hector: 1 active, 32 MW of 3 filed
- Potter: 1 active, 15.1 MW of 2 filed
- Gold: none active of 3 filed
- Potter-Gold: none active of 3 filed
Site Scanner