Substation Scout

Cowen substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Cowen as the point of interconnection, all in Webster County, WV.

Target commercial operation dates as filed run from Dec 2025 to Jun 2028 (2 filings).

Transmission owner as filed: APS (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-625 Cowen 138kV 138 150 Solar Withdrawn Dec 2025
AG2-658 Cowen 138 kV 138 135.3 Solar Withdrawn Jun 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Cowen (APS, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Webster County, WV

All 3 PJM queue filings in Webster County, WV.

Site Scanner