Laurel Mountain substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-294 | Laurel Mountain 138 kV | 138 | 52.9 | Wind | Withdrawn |
| AG2-011 | Laurel Mountain 138 kV | 138 | 34.2 | Battery | Withdrawn |
| AC1-073 | Laurel Mountain Wind Farm & Energy Storage Facility | 138 | 5.8 | Hybrid | Canceled |
| W2-057 | Laurel Mountain BT | n/r | 0 | Battery | Deactivated |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.