Substation Scout

Laurel Mountain substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

4 PJM queue filings name Laurel Mountain as the point of interconnection, all in WV.

Target commercial operation dates as filed run from Jul 2011 to Jan 2028 (4 filings).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-294 Laurel Mountain 138 kV 138 52.9 Wind Withdrawn Jan 2028
AG2-011 Laurel Mountain 138 kV 138 34.2 Battery Withdrawn Apr 2024
AC1-073 Laurel Mountain Wind Farm & Energy Storage Facility 138 5.8 Hybrid Canceled Dec 2019
W2-057 Laurel Mountain BT n/r 0 Battery Deactivated Jul 2011

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Randolph County, WV

All 8 PJM queue filings in Randolph County, WV.

Other PJM queue substations in Barbour County, WV

All 9 PJM queue filings in Barbour County, WV.