Webster, WV interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-625 Cowen 138kV 138 150 Solar Withdrawn
AG2-658 Cowen 138 kV 138 135.3 Solar Withdrawn
V3-027 Pickens 138kV 138 26 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.