Pickens 138 kV

PJM queue ID C01-2153

Pickens 138 kV (C01-2153) is listed in the PJM interconnection queue as a 111.2 MW wind project in Randolph County, WV. The filing names Pickens as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2030.

Queue IDC01-2153
Project namePickens 138 kV
Status (as published)Active
SubstationPickens
Point of interconnectionPickens 138 kV
CountyRandolph
StateWV
Voltage138 kV
Capacity111.2 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2030-10-31
Source datasetcycle

Same substation and county

Pickens substation: 2 requests in the PJM queue, 1 active totaling 111.2 MW.

Queue IDProjectMWResourceStatus
V3-027Pickens 138kV26WindWithdrawn

Randolph, WV: 8 requests in the PJM queue, 3 active totaling 346.8 MW.

A substation with the same name is named in PJM transmission planning materials: Pickens (APS, 12 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperTwinleaf Wind Power, LLC
Transmission ownerAPS
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy168.0
MW capacity111.2
MFO168.0
Submitted date4/24/2026
Last updated6/16/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first