Substation Scout

Randolph, WV interconnection queue

3 active projects totalling 346.8 MW in the PJM queue, plus 5 with terminal status (shown greyed).

3active projects
346.8active MW
8total filed
Queue IDProjectkVMWResourceStatus
C01-2095 Pickens - Monterville 138 kV 138 182.7 Wind Active
C01-2153 Pickens 138 kV 138 111.2 Wind Active
AH2-424 Durbin-Pickens 138 kV 138 84 Hybrid Withdrawn
C01-2211 Leadsville 138 kV 138 52.9 Wind Active
AI2-294 Laurel Mountain 138 kV 138 52.9 Wind Withdrawn
AI1-006 Monterville - Pickens 138 kV 138 18.1 Wind Withdrawn
P58 Canaan - Seneca 138kV 138 16 Wind Withdrawn
U4-002 Pickens-Monterville 138kV 138 13 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.