Perryman 115 kV

PJM queue ID C01-1555

Perryman 115 kV (C01-1555) is listed in the PJM interconnection queue as a 25 MW battery project in Harford County, MD. The filing names Perryman as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2029.

Queue IDC01-1555
Project namePerryman 115 kV
Status (as published)Active
SubstationPerryman
Point of interconnectionPerryman 115 kV
CountyHarford
StateMD
Voltage115 kV
Capacity25 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-06-01
Source datasetcycle

Same substation and county

Perryman substation: 7 requests in the PJM queue, 7 active totaling 955 MW.

Queue IDProjectMWResourceStatus
C01-1579Perryman 115 kV555GasActive
C01-1559Perryman 115 kV200BatteryActive
S32Perryman 6 Units 1-4130GasIn Service
C01-1557Perryman 115 kV25BatteryActive
G30Perryman 5110CoalIn Service
T147Perryman Generating Unit 5110GasIn Service

Harford, MD: 28 requests in the PJM queue, 16 active totaling 2,263 MW.

A substation with the same name is named in PJM transmission planning materials: Perryman (BGE, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperPERRYMAN BATTERY STORAGE 1, LLC
Transmission ownerBGE
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy25.0
MW capacity25.0
MFO25.0
Submitted date4/27/2026
Last updated6/5/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.