Perryman 115 kV
PJM queue ID C01-1579
Perryman 115 kV (C01-1579) is listed in the PJM interconnection queue as a 555 MW gas project in Harford County, MD. The filing names Perryman as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 15, 2029.
| Queue ID | C01-1579 |
|---|---|
| Project name | Perryman 115 kV |
| Status (as published) | Active |
| Substation | Perryman |
| Point of interconnection | Perryman 115 kV |
| County | Harford |
| State | MD |
| Voltage | 115 kV |
| Capacity | 555 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2029-12-15 |
| Source dataset | cycle |
Same substation and county
Perryman substation: 7 requests in the PJM queue, 7 active totaling 955 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1559 | Perryman 115 kV | 200 | Battery | Active |
| S32 | Perryman 6 Units 1-4 | 130 | Gas | In Service |
| C01-1555 | Perryman 115 kV | 25 | Battery | Active |
| C01-1557 | Perryman 115 kV | 25 | Battery | Active |
| G30 | Perryman 51 | 10 | Coal | In Service |
| T147 | Perryman Generating Unit 51 | 10 | Gas | In Service |
Harford, MD: 28 requests in the PJM queue, 16 active totaling 2,263 MW.
A substation with the same name is named in PJM transmission planning materials: Perryman (BGE, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | PERRYMAN GAS, LLC |
|---|---|
| Transmission owner | BGE |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 555.0 |
| MW capacity | 555.0 |
| MFO | 555.0 |
| Submitted date | 4/25/2026 |
| Last updated | 6/3/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.