South Creek substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name South Creek as the point of interconnection, all in Appomattox County, VA.

Target commercial operation dates as filed run from Mar 2020 to Dec 2023 (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AD2-201 South Creek 115 kV 115 40.5 Solar Withdrawn Mar 2020
AG2-133 South Creek 69 kV 69 34.1 Solar Withdrawn Dec 2023
AD1-157 Spout Springs Solar 34.5 9 Solar Withdrawn Dec 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “South Creek” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Appomattox County, VA

All 7 PJM queue filings in Appomattox County, VA.