West Point Cogeneration Facility
PJM queue ID AE1-221
West Point Cogeneration Facility (AE1-221) is listed in the PJM interconnection queue as a gas request filed at 0 MW (a net change or energy-only filing) in Montgomery County, PA. The filing names North Wales as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2022.
| Queue ID | AE1-221 |
|---|---|
| Project name | West Point Cogeneration Facility |
| Status (as published) | In Service |
| Substation | North Wales |
| Point of interconnection | North Wales 34.5 kV |
| County | Montgomery |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2022-06-01 |
| Source dataset | serial |
Same substation and county
North Wales substation: 5 requests in the PJM queue, 2 active totaling 38 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| G22 | Merck | 38 | Gas | In Service |
| AB1-033 | Morris Road | 4.1 | Other | Deactivated |
| V1-028 | Morris Road | 2 | Other | Deactivated |
| AB1-031 | North Wales 34kV | 0 | Other | Withdrawn |
Montgomery, PA: 28 requests in the PJM queue, 4 active totaling 391 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 0 |
| MW capacity | 0 |
| MFO | 38 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.