Mississinewa 138 kV
PJM queue ID AG2-192
Mississinewa 138 kV (AG2-192) is listed in the PJM interconnection queue as a 11.4 MW solar project in Grant County, IN. The filing names Mississinewa as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 1, 2029.
| Queue ID | AG2-192 |
|---|---|
| Project name | Mississinewa 138 kV |
| Status (as published) | Active |
| Substation | Mississinewa |
| Point of interconnection | Mississinewa 138 kV |
| County | Grant |
| State | IN |
| Voltage | 138 kV |
| Capacity | 11.4 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-10-01 |
| Source dataset | cycle |
Same substation and county
Mississinewa substation: 3 requests in the PJM queue, 3 active totaling 74.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-414 | BR Solar Sheriff 1 | 45 | Solar | Engineering and Procurement |
| AG2-191 | Mississinewa 138 kV | 18 | Solar | Active |
Grant, IN: 15 requests in the PJM queue, 9 active totaling 497.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | BR Solar Sheriff 3 LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 19.0 |
| MW capacity | 11.4 |
| MFO | 19.0 |
| Submitted date | 2/27/2021 |
| Last updated | 8/28/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.