Mississinewa 138 kV

PJM queue ID AG2-192

Mississinewa 138 kV (AG2-192) is listed in the PJM interconnection queue as a 11.4 MW solar project in Grant County, IN. The filing names Mississinewa as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 1, 2029.

Queue IDAG2-192
Project nameMississinewa 138 kV
Status (as published)Active
SubstationMississinewa
Point of interconnectionMississinewa 138 kV
CountyGrant
StateIN
Voltage138 kV
Capacity11.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-10-01
Source datasetcycle

Same substation and county

Mississinewa substation: 3 requests in the PJM queue, 3 active totaling 74.4 MW.

Queue IDProjectMWResourceStatus
AG1-414BR Solar Sheriff 145SolarEngineering and Procurement
AG2-191Mississinewa 138 kV18SolarActive

Grant, IN: 15 requests in the PJM queue, 9 active totaling 497.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperBR Solar Sheriff 3 LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy19.0
MW capacity11.4
MFO19.0
Submitted date2/27/2021
Last updated8/28/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.