Kirk substation interconnection queue
1 active project totalling 64.6 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
64.6active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-122 | Union Ridge Solar | 138 | 64.6 | Solar | Partially in Service - Under Construction |
| AH1-325 | Kirk 138 kV | 138 | 50 | Battery | Withdrawn |
| Z1-063 | Kirk 34.5kV | 34.5 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.