1 active project totaling 64.6 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Kirk as the point of interconnection, all in Licking County, OH.
Target commercial operation dates as filed run from Dec 2016 to Jan 2026 (3 filings).
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-122 | Union Ridge Solar | 138 | 64.6 | Solar | Partially in Service - Under Construction | Jan 2026 |
| AH1-325 | Kirk 138 kV | 138 | 50 | Battery | Withdrawn | Dec 2025 |
| Z1-063 | Kirk 34.5kV | 34.5 | 0 | Battery | Withdrawn | Dec 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Kirk (AEP, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Same name on other Substation Scout pages
Other sources that print a substation named “Kirk” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Kirk: Expansion Tracker, PJM planning: PJM system-wide state not printed
Other PJM queue substations in Licking County, OH
- Jug Street: 3 active, 400 MW of 4 filed
- Centerburg: 3 active, 146.3 MW of 6 filed
- Hazelton - Kirk: none active of 2 filed