Hazelton - Kirk substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-550 Hazelton - Kirk 138 kV 138 66 Solar Withdrawn
AI2-427 Hazelton - Kirk 138 kV 138 26.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.