Substation Scout

Licking, OH interconnection queue

8 active projects totalling 1,039.5 MW in the PJM queue, plus 15 with terminal status (shown greyed).

8active projects
1,039.5active MW
23total filed
Queue IDProjectkVMWResourceStatus
C01-1308 Ridgely 138 kV 138 428.6 Gas Active
AI2-088 Centerburg 138 kV 138 229.6 Solar Withdrawn
AE2-300 Not reported n/r 200 Battery Withdrawn
C01-2017 Jug Street 138 kV 138 200 Battery Active
AI2-226 Jug Street 138 kV 138 120 Battery Withdrawn
C01-1461 Jug Street 138 kV 138 120 Battery Active
AH1-036 Centerburg 138 kV 138 100 Battery Withdrawn
AF1-062 Flint Grid 138 80 Battery Engineering and Procurement
AH1-550 Hazelton - Kirk 138 kV 138 66 Solar Withdrawn
AF2-122 Union Ridge Solar 138 64.6 Solar Partially in Service - Under Construction
AD2-067 Harvey Solar I 138 57 Solar Engineering and Procurement
AG1-034 Harvey Solar I 138 53.6 Solar Engineering and Procurement
AH1-325 Kirk 138 kV 138 50 Battery Withdrawn
AG1-024 Harvey Solar I 138 35.7 Solar Engineering and Procurement
AI2-427 Hazelton - Kirk 138 kV 138 26.4 Solar Withdrawn
AI2-402 Kirk - Newark Center 138 kV 138 25.8 Solar Withdrawn
AE2-073 Centerburg 138kV 138 21 Solar Withdrawn
AG2-006 Centerburg-Conesville 138 kV 138 21 Solar Withdrawn
AI2-483 Heath 69 kV 69 13.4 Battery Withdrawn
AF2-198 Heath 69 kV 69 9 Battery Withdrawn
AA1-121 Denison University 12 0 Battery Withdrawn
Z1-063 Kirk 34.5kV 34.5 0 Battery Withdrawn
Z1-094 Jugg 34.5kV 34.5 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.