Jug Street substation interconnection queue
3 active projects totaling 400 MW in the PJM queue, plus 1 with terminal status (shown grayed).
4 PJM queue filings name Jug Street as the point of interconnection, all in Licking County, OH.
Target commercial operation dates as filed run from Aug 2022 to Feb 2029 (4 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2017 | Jug Street 138 kV | 138 | 200 | Battery | Active | Feb 2029 |
| AI2-226 | Jug Street 138 kV | 138 | 120 | Battery | Withdrawn | Aug 2022 |
| C01-1461 | Jug Street 138 kV | 138 | 120 | Battery | Active | Nov 2026 |
| AF1-062 | Flint Grid | 138 | 80 | Battery | Under Construction | May 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Jug Street (AEP, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-19 | AF1-062 | Status change | n/a | Engineering and Procurement → Under Construction |
Other PJM queue substations in Licking County, OH
- Centerburg: 3 active, 146.3 MW of 6 filed
- Kirk: 1 active, 64.6 MW of 3 filed
- Hazelton - Kirk: none active of 2 filed
- Heath: none active of 2 filed