Jug Street substation interconnection queue
3 active projects totalling 400 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3active projects
400active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2017 | Jug Street 138 kV | 138 | 200 | Battery | Active |
| AI2-226 | Jug Street 138 kV | 138 | 120 | Battery | Withdrawn |
| C01-1461 | Jug Street 138 kV | 138 | 120 | Battery | Active |
| AF1-062 | Flint Grid | 138 | 80 | Battery | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.