Substation Scout

Union Ridge Solar

PJM queue ID AF2-122

Union Ridge Solar (AF2-122) is listed in the PJM interconnection queue as a 64.6 MW solar project in Licking County, OH. The filing names Kirk as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of January 31, 2026.

Queue IDAF2-122
Project nameUnion Ridge Solar
Status (as published)Partially in Service - Under Construction
SubstationKirk
Point of interconnectionKirk 138 kV
CountyLicking
StateOH
Voltage138 kV
Capacity64.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-01-31
Source datasetserial

Same substation and county

Kirk substation: 3 requests in the PJM queue, 1 active totaling 64.6 MW.

Queue IDProjectMWResourceStatus
AH1-325Kirk 138 kV50BatteryWithdrawn
Z1-063Kirk 34.5kV0BatteryWithdrawn

Licking, OH: 23 requests in the PJM queue, 8 active totaling 1,039.5 MW.

A substation with the same name is named in PJM transmission planning materials: Kirk (AEP, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy98
MW capacity64.62
MFO98

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first