3 active projects totalling 146.3 MW in the PJM queue, plus 3 with terminal status (shown greyed).

3active projects
146.3active MW
6total filed
Queue IDProjectkVMWResourceStatus
AI2-088 Centerburg 138 kV 138 229.6 Solar Withdrawn
AH1-036 Centerburg 138 kV 138 100 Battery Withdrawn
AD2-067 Harvey Solar I 138 57 Solar Engineering and Procurement
AG1-034 Harvey Solar I 138 53.6 Solar Engineering and Procurement
AG1-024 Harvey Solar I 138 35.7 Solar Engineering and Procurement
AE2-073 Centerburg 138kV 138 21 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.