TWE Myrtle Solar Project
PJM queue ID AD1-144
TWE Myrtle Solar Project (AD1-144) is listed in the PJM interconnection queue as a 9.7 MW solar project in City of Suffolk, VA. The filing names Kings Fork as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2020.
| Queue ID | AD1-144 |
|---|---|
| Project name | TWE Myrtle Solar Project |
| Status (as published) | In Service |
| Substation | Kings Fork |
| Point of interconnection | Kings Fork 34.5 kV |
| County | City of Suffolk |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 9.7 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2020-06-01 |
| Source dataset | serial |
Same substation and county
Kings Fork substation: 4 requests in the PJM queue, 1 active totaling 9.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| U2-031 | Kings Fork 34.5kV | 24.8 | Gas | Withdrawn |
| AD2-215 | Godwin Blvd Solar | 9.8 | Solar | Withdrawn |
| AA2-040 | Kings Fork 34.5kV | 0 | Other | Withdrawn |
City of Suffolk, VA: 28 requests in the PJM queue, 3 active totaling 31.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 15 |
| MW capacity | 9.7 |
| MFO | 15 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.