Substation Scout

Hawks Nest Hydro

PJM queue ID AE2-160

Hawks Nest Hydro (AE2-160) is listed in the PJM interconnection queue as a 30 MW hydro project in Fayette County, WV. The filing names Kanawha River as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 30, 2029.

Queue IDAE2-160
Project nameHawks Nest Hydro
Status (as published)Engineering and Procurement
SubstationKanawha River
Point of interconnectionKanawha River 138 kV
CountyFayette
StateWV
Voltage138 kV
Capacity30 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Target commercial operation2029-09-30
Source datasetserial

Same substation and county

Kanawha River substation: 4 requests in the PJM queue, 1 active totaling 30 MW.

Queue IDProjectMWResourceStatus
AE2-158Kanawha River 138 kV48HydroWithdrawn
W3-161Kanawha River 138kV13OtherWithdrawn
AE2-159Kanawha River 138 kV0HydroWithdrawn

Fayette, WV: 15 requests in the PJM queue, 4 active totaling 153.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy51
MW capacity30
MFO105.159

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.