Hawks Nest Hydro
PJM queue ID AE2-160
Hawks Nest Hydro (AE2-160) is listed in the PJM interconnection queue as a 30 MW hydro project in Fayette County, WV. The filing names Kanawha River as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 30, 2029.
| Queue ID | AE2-160 |
|---|---|
| Project name | Hawks Nest Hydro |
| Status (as published) | Engineering and Procurement |
| Substation | Kanawha River |
| Point of interconnection | Kanawha River 138 kV |
| County | Fayette |
| State | WV |
| Voltage | 138 kV |
| Capacity | 30 MW |
| Resource (as published) | Hydro |
| Resource category | Hydro (normalized for filtering) |
| Target commercial operation | 2029-09-30 |
| Source dataset | serial |
Same substation and county
Kanawha River substation: 4 requests in the PJM queue, 1 active totaling 30 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE2-158 | Kanawha River 138 kV | 48 | Hydro | Withdrawn |
| W3-161 | Kanawha River 138kV | 13 | Other | Withdrawn |
| AE2-159 | Kanawha River 138 kV | 0 | Hydro | Withdrawn |
Fayette, WV: 15 requests in the PJM queue, 4 active totaling 153.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 51 |
| MW capacity | 30 |
| MFO | 105.159 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.