Substation Scout

Flint Grid

PJM queue ID AF1-062

Flint Grid (AF1-062) is listed in the PJM interconnection queue as a 80 MW battery project in Licking County, OH. The filing names Jug Street as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of May 1, 2027.

Queue IDAF1-062
Project nameFlint Grid
Status (as published)Under Construction
SubstationJug Street
Point of interconnectionJug Street 138 kV
CountyLicking
StateOH
Voltage138 kV
Capacity80 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-05-01
Source datasetserial

Same substation and county

Jug Street substation: 4 requests in the PJM queue, 3 active totaling 400 MW.

Queue IDProjectMWResourceStatus
C01-2017Jug Street 138 kV200BatteryActive
C01-1461Jug Street 138 kV120BatteryActive
AI2-226Jug Street 138 kV120BatteryWithdrawn

Licking, OH: 23 requests in the PJM queue, 8 active totaling 1,039.5 MW.

A substation with the same name is named in PJM transmission planning materials: Jug Street (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-19 Status change n/a Engineering and Procurement → Under Construction

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity80
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.