Hoytdale substation interconnection queue
1 active project totaling 150 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Hoytdale as the point of interconnection, all in Beaver County, PA.
Target commercial operation dates as filed run from Nov 2016 to Mar 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: ATSI (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-621 | Hoytdale 138 kV | 138 | 150 | Battery | Active | Mar 2028 |
| AB1-147 | Hoytdale 138kV | 138 | 0 | Battery | Withdrawn | Nov 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Hoytdale (ATSI, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Beaver County, PA
- Beaver Valley: 3 active, 1,770 MW of 4 filed
- Beaver Valley #1: 2 active, 118 MW of 2 filed
- Beaver Valley #2: 2 active, 115 MW of 2 filed
- Valley-Raccoon: 1 active, 97 MW of 2 filed
- Sammis - Beaver Valley: none active of 2 filed