Substation Scout

Beaver Valley substation interconnection queue

3 active projects totalling 1,770 MW in the PJM queue, plus 1 with terminal status (shown greyed).

3active projects
1,770active MW
4total filed
Queue IDProjectkVMWResourceStatus
R67 Beaver Valley 345kV 345 2,510 Coal Withdrawn
N13 Beaver Valley n/r 1,630 Nuclear In Service
C01-1503 Beaver Valley 345 kV 345 70 Nuclear Active
C01-1504 Beaver Valley 345 kV 345 70 Nuclear Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.