Substation Scout

Hoytdale 138 kV

PJM queue ID AG2-621

Hoytdale 138 kV (AG2-621) is listed in the PJM interconnection queue as a 150 MW battery project in Beaver County, PA. The filing names Hoytdale as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 1, 2028.

Queue IDAG2-621
Project nameHoytdale 138 kV
Status (as published)Active
SubstationHoytdale
Point of interconnectionHoytdale 138 kV
CountyBeaver
StatePA
Voltage138 kV
Capacity150 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-03-01
Source datasetcycle

Same substation and county

Hoytdale substation: 2 requests in the PJM queue, 1 active totaling 150 MW.

Queue IDProjectMWResourceStatus
AB1-147Hoytdale 138kV0BatteryWithdrawn

Beaver, PA: 27 requests in the PJM queue, 12 active totaling 4,770.6 MW.

A substation with the same name is named in PJM transmission planning materials: Hoytdale (ATSI, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperACE Development Company, LLC
Transmission ownerATSI
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy150.0
MW capacity150.0
MFO150.0
Submitted date3/31/2021
Last updated7/6/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.