Substation Scout

Sammis - Beaver Valley substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1865 Sammis - Beaver Valley 345 kV 345 250 Hybrid Withdrawn
C01-1919 Sammis - Beaver Valley 345 kV 345 250 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.