Valley-Raccoon substation interconnection queue
1 active project totaling 97 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Valley-Raccoon as the point of interconnection, all in Beaver County, PA.
Target commercial operation dates as filed run from Jun 2017 to Nov 2021 (2 filings).
1active projects
97active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Y2-065 | Valley-Raccoon 138kV | 138 | 97 | Gas | Withdrawn | Jun 2017 |
| Y3-103 | Pennsylvania Chemicals Generating Facility | 138 | 97 | Gas | In Service | Nov 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Beaver County, PA
- Beaver Valley: 3 active, 1,770 MW of 4 filed
- Hoytdale: 1 active, 150 MW of 2 filed
- Beaver Valley #1: 2 active, 118 MW of 2 filed
- Beaver Valley #2: 2 active, 115 MW of 2 filed
- Sammis - Beaver Valley: none active of 2 filed