Valley-Raccoon substation interconnection queue

1 active project totaling 97 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Valley-Raccoon as the point of interconnection, all in Beaver County, PA.

Target commercial operation dates as filed run from Jun 2017 to Nov 2021 (2 filings).

1active projects
97active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
Y2-065 Valley-Raccoon 138kV 138 97 Gas Withdrawn Jun 2017
Y3-103 Pennsylvania Chemicals Generating Facility 138 97 Gas In Service Nov 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.