Hosensack substation interconnection queue
2 active projects totalling 1,100 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
1,100active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| A25 | Hosensack 500 kV | 500 | 1,000 | Gas | Withdrawn |
| B03 | Bethlehem | 500 | 750 | Gas | In Service |
| D18 | Conectiv Bethlem CT 6, ST2 | 230 | 350 | Gas | In Service |
| E27 | Hosensack 500kV | 500 | 350 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.