Bethlehem (B03) is listed in the PJM interconnection queue as a 750 MW gas project in Northampton County, PA. The filing names Hosensack as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 28, 2003.

Queue IDB03
Project nameBethlehem
Status (as published)In Service
SubstationHosensack
Point of interconnectionHosensack 500kV
CountyNorthampton
StatePA
Voltage500 kV
Capacity750 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2003-01-28
Source datasetserial

Same substation and county

Hosensack substation: 4 requests in the PJM queue, 2 active totaling 1,100 MW.

Queue IDProjectMWResourceStatus
D18Conectiv Bethlem CT 6, ST2350GasIn Service
A25Hosensack 500 kV1,000GasWithdrawn
E27Hosensack 500kV350GasWithdrawn

Northampton, PA: 39 requests in the PJM queue, 14 active totaling 2,510.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy750
MW capacity750
MFO750

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.