Portland substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| A43 | Portland 230 kV | 230 | 472 | Gas | Withdrawn |
| B27 | Portland 230kV | 230 | 362 | Gas | Withdrawn |
| G38 | Portland | n/r | 86 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.