Substation Scout

Martins Creek–Cherry Hill substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-227 Martins Creek–Cherry Hill 69 kV 69 38.3 Solar Withdrawn
AI2-352 Martins Creek–Cherry Hill 69 kV 69 22 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.