Substation Scout

Mt. Bethel substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
U3-009 Mt. Bethel 230kV 230 595 Other Withdrawn
U3-008 Mt. Bethel 230kV 230 200 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.