Substation Scout

Summit Farms Solar and Ranchland Solar

PJM queue ID AA1-139

Summit Farms Solar and Ranchland Solar (AA1-139) is listed in the PJM interconnection queue as a 84 MW solar project in Currituck County, NC. The filing names Hickory-Shawboro as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 28, 2018.

Queue IDAA1-139
Project nameSummit Farms Solar and Ranchland Solar
Status (as published)In Service
SubstationHickory-Shawboro
Point of interconnectionHickory-Shawboro 230kV
CountyCurrituck
StateNC
Voltage230 kV
Capacity84 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2018-02-28
Source datasetserial

Same substation and county

Hickory-Shawboro substation: 3 requests in the PJM queue, 1 active totaling 84 MW.

Queue IDProjectMWResourceStatus
AA1-133Hickory-Shawboro 230kV56SolarWithdrawn
AG2-239Hickory-Shawboro 230 kV0BatteryWithdrawn

Currituck, NC: 17 requests in the PJM queue, 5 active totaling 305.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy120
MW capacity84
MFO120

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.