Hector 115 kV (C01-2126) is listed in the PJM interconnection queue as a 32 MW wind project in Potter County, PA. The filing names Hector as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of January 1, 2028.

Queue IDC01-2126
Project nameHector 115 kV
Status (as published)Active
SubstationHector
Point of interconnectionHector 115 kV
CountyPotter
StatePA
Voltage115 kV
Capacity32 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2028-01-01
Source datasetcycle

Same substation and county

Hector substation: 3 requests in the PJM queue, 1 active totaling 32 MW.

Queue IDProjectMWResourceStatus
AI2-121Hector 115 kV20WindWithdrawn
AH1-002Hector 115 kV7.4WindWithdrawn

Potter, PA: 25 requests in the PJM queue, 4 active totaling 64.2 MW.

A substation with the same name is named in PJM transmission planning materials: Hector (PENELEC, 4 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperBig Level Wind LLC
Transmission ownerPENELEC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity32.04
MFO90.0
Submitted date4/24/2026
Last updated6/5/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first