Big Level Wind Farm
PJM queue ID Z1-069
Big Level Wind Farm (Z1-069) is listed in the PJM interconnection queue as a 13.3 MW wind project in Potter County, PA. The filing names Gold-Sabinsville as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 31, 2019.
| Queue ID | Z1-069 |
|---|---|
| Project name | Big Level Wind Farm |
| Status (as published) | In Service |
| Substation | Gold-Sabinsville |
| Point of interconnection | Gold-Sabinsville 115kV |
| County | Potter |
| State | PA |
| Voltage | 115 kV |
| Capacity | 13.3 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2019-10-31 |
| Source dataset | serial |
Same substation and county
Gold-Sabinsville substation: 4 requests in the PJM queue, 2 active totaling 17.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB1-160 | Big Level Wind Farm | 3.8 | Wind | In Service |
| Q24 | Gold-Sabinsville 115kV | 20 | Wind | Withdrawn |
| N36 | Gold Sabinsville | 10 | Wind | Withdrawn |
Potter, PA: 25 requests in the PJM queue, 4 active totaling 64.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 70 |
| MW capacity | 13.3 |
| MFO | 70 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.