Substation Scout

Garden Plain 138 kV

PJM queue ID C01-1588

Garden Plain 138 kV (C01-1588) is listed in the PJM interconnection queue as a 20 MW wind project in Whiteside County, IL. The filing names Garden Plain as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 28, 2031.

Queue IDC01-1588
Project nameGarden Plain 138 kV
Status (as published)Active
SubstationGarden Plain
Point of interconnectionGarden Plain 138 kV
CountyWhiteside
StateIL
Voltage138 kV
Capacity20 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2031-04-28
Source datasetcycle

Same substation and county

Garden Plain substation: 5 requests in the PJM queue, 2 active totaling 53.6 MW.

Queue IDProjectMWResourceStatus
AF1-296Gipper Wind Farm33.6WindEP
AH2-376Garden Plain 138 kV153BatteryWithdrawn
C01-1587Garden Plain 138 kV150BatteryWithdrawn
AH2-270Garden Plain 138 kV51WindWithdrawn

Whiteside, IL: 13 requests in the PJM queue, 5 active totaling 246.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperGipper Wind Farm, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity20.0
MFO190.89
Submitted date4/27/2026
Last updated6/25/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.