Gipper Wind Farm

PJM queue ID AF1-296

Gipper Wind Farm (AF1-296) is listed in the PJM interconnection queue as a 33.6 MW wind project in Whiteside County, IL. The filing names Garden Plain as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of September 30, 2029.

Queue IDAF1-296
Project nameGipper Wind Farm
Status (as published)EP
SubstationGarden Plain
Point of interconnectionGarden Plain 138 kV
CountyWhiteside
StateIL
Voltage138 kV
Capacity33.6 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2029-09-30
Source datasetcycle

Same substation and county

Garden Plain substation: 5 requests in the PJM queue, 2 active totaling 53.6 MW.

Queue IDProjectMWResourceStatus
C01-1588Garden Plain 138 kV20WindActive
AH2-376Garden Plain 138 kV153BatteryWithdrawn
C01-1587Garden Plain 138 kV150BatteryWithdrawn
AH2-270Garden Plain 138 kV51WindWithdrawn

Whiteside, IL: 13 requests in the PJM queue, 5 active totaling 246.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperGipper Wind Farm, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy190.89
MW capacity33.6
MFO190.89
Submitted date9/30/2019
Last updated2/23/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.