Gipper Wind Farm
PJM queue ID AF1-296
Gipper Wind Farm (AF1-296) is listed in the PJM interconnection queue as a 33.6 MW wind project in Whiteside County, IL. The filing names Garden Plain as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of September 30, 2029.
| Queue ID | AF1-296 |
|---|---|
| Project name | Gipper Wind Farm |
| Status (as published) | EP |
| Substation | Garden Plain |
| Point of interconnection | Garden Plain 138 kV |
| County | Whiteside |
| State | IL |
| Voltage | 138 kV |
| Capacity | 33.6 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2029-09-30 |
| Source dataset | cycle |
Same substation and county
Garden Plain substation: 5 requests in the PJM queue, 2 active totaling 53.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1588 | Garden Plain 138 kV | 20 | Wind | Active |
| AH2-376 | Garden Plain 138 kV | 153 | Battery | Withdrawn |
| C01-1587 | Garden Plain 138 kV | 150 | Battery | Withdrawn |
| AH2-270 | Garden Plain 138 kV | 51 | Wind | Withdrawn |
Whiteside, IL: 13 requests in the PJM queue, 5 active totaling 246.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Gipper Wind Farm, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 190.89 |
| MW capacity | 33.6 |
| MFO | 190.89 |
| Submitted date | 9/30/2019 |
| Last updated | 2/23/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.