Vermilion Grove Wind

PJM queue ID AF1-204

Vermilion Grove Wind (AF1-204) is listed in the PJM interconnection queue as a 63.8 MW wind project in Vermillion County, IN. The filing names Eugene as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of March 31, 2029.

Queue IDAF1-204
Project nameVermilion Grove Wind
Status (as published)EP
SubstationEugene
Point of interconnectionEugene 345 kV
CountyVermillion
StateIN
Voltage345 kV
Capacity63.8 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2029-03-31
Source datasetcycle

Same substation and county

Eugene substation: 7 requests in the PJM queue, 3 active totaling 273.8 MW.

Queue IDProjectMWResourceStatus
C01-2088Eugene 345 kV120HybridActive
AG2-126Eugene 345 kV90HybridActive
AH1-453Eugene 345 kV150BatteryWithdrawn
AH2-153Eugene 345 kV140HybridWithdrawn
AH2-154Eugene 345 kV118HybridWithdrawn
AH1-289Eugene 345 kV52.8WindWithdrawn

Vermillion, IN: 15 requests in the PJM queue, 3 active totaling 273.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperVermilion Grove Wind, LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy255.0
MW capacity63.75
MFO255.0
Submitted date9/25/2019
Last updated2/17/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first