Substation Scout

Eugene 345 kV

PJM queue ID C01-2088

Eugene 345 kV (C01-2088) is listed in the PJM interconnection queue as a 120 MW hybrid project in Vermillion County, IN. The filing names Eugene as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2030.

Queue IDC01-2088
Project nameEugene 345 kV
Status (as published)Active
SubstationEugene
Point of interconnectionEugene 345 kV
CountyVermillion
StateIN
Voltage345 kV
Capacity120 MW
Resource (as published)Solar,Storage,Hybrid
Resource categoryHybrid (normalized for filtering)
Target commercial operation2030-10-31
Source datasetcycle

Same substation and county

Eugene substation: 7 requests in the PJM queue, 3 active totaling 273.8 MW.

Queue IDProjectMWResourceStatus
AG2-126Eugene 345 kV90HybridActive
AF1-204Vermilion Grove Wind63.8WindEP
AH1-453Eugene 345 kV150BatteryWithdrawn
AH2-153Eugene 345 kV140HybridWithdrawn
AH2-154Eugene 345 kV118HybridWithdrawn
AH1-289Eugene 345 kV52.8WindWithdrawn

Vermillion, IN: 15 requests in the PJM queue, 3 active totaling 273.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperTGE Illinois 211, LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy200.0
MW capacity120.0
MFO350.0
Submitted date4/27/2026
Last updated6/15/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first