Substation Scout

England

Named in 2 PJM planning documents for 2 projects, from February 12, 2026 to October 16, 2026.

Not stateddescribed as
ACEzone
138 kV, 138kVkV as printed
2mentions

PJM interconnection queue

A PJM queue substation page has the same name: England (NJ) — 3 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
ACE Transmission Zone: b3227
b3227
Not printed $20M 6/1/2026 Not printed 2026-02-12
SRRTEP Mid-Atlantic
ACE-2026-004 Not printed Not printed Not printed Not printed 2026-10-16
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$13.2 M → $20M 2026-02-12 2026-02-12

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Mid-Atlantic
Item 01 - ACE Supplemental Projects Presentation p. 3
ACE-2026-004 No role wording
138kV
2026-02-12 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 6
ACE Transmission Zone: b3227 No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this