Elk substation interconnection queue
3 active projects
totalling 137 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3 active projects
137 active MW
4 total filed
Queue ID Project kV MW Resource Status
AC1-194
Vinton Solar
138
47.5
Solar
Engineering and Procurement
AI2-157
Elk 138 kV
138
47.5
Solar
Withdrawn
C01-1656
Elk 138 kV
138
47.5
Solar
Active
AE1-093
Vinton Energy Storage
138
42
Battery
Suspended
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.