Vinton, OH interconnection queue

4 active projects totalling 226.6 MW in the PJM queue, plus 2 with terminal status (shown greyed).

4active projects
226.6active MW
6total filed
Queue IDProjectkVMWResourceStatus
C01-2045 Flatlick 765 kV 765 624.5 Gas Withdrawn
AF2-395 Rolling Hills Generating 765 89.6 Gas In Service
AC1-194 Vinton Solar 138 47.5 Solar Engineering and Procurement
AI2-157 Elk 138 kV 138 47.5 Solar Withdrawn
C01-1656 Elk 138 kV 138 47.5 Solar Active
AE1-093 Vinton Energy Storage 138 42 Battery Suspended

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.