Vinton Energy Storage
PJM queue ID AE1-093
Vinton Energy Storage (AE1-093) is listed in the PJM interconnection queue as a 42 MW battery project in Vinton County, OH. The filing names Elk as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 31, 2026.
| Queue ID | AE1-093 |
|---|---|
| Project name | Vinton Energy Storage |
| Status (as published) | Suspended |
| Substation | Elk |
| Point of interconnection | Elk 138 kV |
| County | Vinton |
| State | OH |
| Voltage | 138 kV |
| Capacity | 42 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-12-31 |
| Source dataset | serial |
Same substation and county
Elk substation: 4 requests in the PJM queue, 3 active totaling 137 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AC1-194 | Vinton Solar | 47.5 | Solar | Suspended |
| C01-1656 | Elk 138 kV | 47.5 | Solar | Active |
| AI2-157 | Elk 138 kV | 47.5 | Solar | Withdrawn |
Vinton, OH: 8 requests in the PJM queue, 6 active totaling 334.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 42 |
| MW capacity | 42 |
| MFO | 167 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.