Vinton Solar
PJM queue ID AC1-194
Vinton Solar (AC1-194) is listed in the PJM interconnection queue as a 47.5 MW solar project in Vinton County, OH. The filing names Elk as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of January 31, 2027.
| Queue ID | AC1-194 |
|---|---|
| Project name | Vinton Solar |
| Status (as published) | Suspended |
| Substation | Elk |
| Point of interconnection | Elk 138kV |
| County | Vinton |
| State | OH |
| Voltage | 138 kV |
| Capacity | 47.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-01-31 |
| Source dataset | serial |
Same substation and county
Elk substation: 4 requests in the PJM queue, 3 active totaling 137 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1656 | Elk 138 kV | 47.5 | Solar | Active |
| AE1-093 | Vinton Energy Storage | 42 | Battery | Suspended |
| AI2-157 | Elk 138 kV | 47.5 | Solar | Withdrawn |
Vinton, OH: 8 requests in the PJM queue, 6 active totaling 334.6 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Status change | n/a | Engineering and Procurement → Suspended |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 125 |
| MW capacity | 47.5 |
| MFO | 125 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.