Vinton Solar (AC1-194) is listed in the PJM interconnection queue as a 47.5 MW solar project in Vinton County, OH. The filing names Elk as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of January 31, 2027.

Queue IDAC1-194
Project nameVinton Solar
Status (as published)Suspended
SubstationElk
Point of interconnectionElk 138kV
CountyVinton
StateOH
Voltage138 kV
Capacity47.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-01-31
Source datasetserial

Same substation and county

Elk substation: 4 requests in the PJM queue, 3 active totaling 137 MW.

Queue IDProjectMWResourceStatus
C01-1656Elk 138 kV47.5SolarActive
AE1-093Vinton Energy Storage42BatterySuspended
AI2-157Elk 138 kV47.5SolarWithdrawn

Vinton, OH: 8 requests in the PJM queue, 6 active totaling 334.6 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Status change n/a Engineering and Procurement → Suspended

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy125
MW capacity47.5
MFO125

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first