Flatlick substation interconnection queue

1 active project totaling 89.6 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Flatlick as the point of interconnection, all in OH.

Target commercial operation dates as filed run from Mar 2017 to Jun 2031 (3 filings).

Transmission owner as filed: AEP (1 filing).

1active projects
89.6active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-2045 Flatlick 765 kV 765 624.5 Gas Withdrawn Jun 2031
X3-051 Flatlick 765kV 765 610 Gas Withdrawn Mar 2017
AF2-395 Rolling Hills Generating 765 89.6 Gas In Service Apr 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Flatlick (AEP, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Vinton County, OH

All 8 PJM queue filings in Vinton County, OH.