Substation Scout

Flatlick substation interconnection queue

1 active project totalling 89.6 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
89.6active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-2045 Flatlick 765 kV 765 624.5 Gas Withdrawn
X3-051 Flatlick 765kV 765 610 Gas Withdrawn
AF2-395 Rolling Hills Generating 765 89.6 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.