Flatlick substation interconnection queue
1 active project totaling 89.6 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Flatlick as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Mar 2017 to Jun 2031 (3 filings).
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2045 | Flatlick 765 kV | 765 | 624.5 | Gas | Withdrawn | Jun 2031 |
| X3-051 | Flatlick 765kV | 765 | 610 | Gas | Withdrawn | Mar 2017 |
| AF2-395 | Rolling Hills Generating | 765 | 89.6 | Gas | In Service | Apr 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Flatlick (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Vinton County, OH
- Elk: 3 active, 137 MW of 4 filed
- Corwin - Elk: 2 active, 108 MW of 3 filed