Deer Creek 138 kV
PJM queue ID C01-1788
Deer Creek 138 kV (C01-1788) is listed in the PJM interconnection queue as a 210 MW battery project in Grant County, IN. The filing names Deer Creek as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 30, 2030.
| Queue ID | C01-1788 |
|---|---|
| Project name | Deer Creek 138 kV |
| Status (as published) | Active |
| Substation | Deer Creek |
| Point of interconnection | Deer Creek 138 kV |
| County | Grant |
| State | IN |
| Voltage | 138 kV |
| Capacity | 210 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-09-30 |
| Source dataset | cycle |
Same substation and county
Deer Creek substation: 2 requests in the PJM queue, 2 active totaling 211.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Z2-115 | Deer Creek Solar Facility | 1.3 | Solar | In Service |
Grant, IN: 15 requests in the PJM queue, 9 active totaling 497.3 MW.
A substation with the same name is named in PJM transmission planning materials: Deer Creek (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | ENGIE IR Holdings LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 210.0 |
| MW capacity | 210.0 |
| MFO | 210.0 |
| Submitted date | 4/25/2026 |
| Last updated | 6/22/2026 |