Frosty Valley Energy Center

PJM queue ID AF2-433

Frosty Valley Energy Center (AF2-433) is listed in the PJM interconnection queue as a 12 MW solar project in Columbia County, PA. The filing names Columbia-Geisinger Tap #1 as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of January 15, 2028.

Queue IDAF2-433
Project nameFrosty Valley Energy Center
Status (as published)Engineering and Procurement
SubstationColumbia-Geisinger Tap #1
Point of interconnectionColumbia-Geisinger Tap #1 69 kV
CountyColumbia
StatePA
Voltage69 kV
Capacity12 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-01-15
Source datasetserial

Same substation and county

Columbia-Geisinger Tap #1 substation: 2 requests in the PJM queue, 2 active totaling 24 MW.

Queue IDProjectMWResourceStatus
AF2-434Frosty Valley Energy Center12SolarEngineering and Procurement

Columbia, PA: 35 requests in the PJM queue, 10 active totaling 135.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity12
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.