Columbus Floodwall

PJM queue ID P44

Columbus Floodwall (P44) is listed in the PJM interconnection queue as a 7 MW project in Franklin County, OH. The filing names City of Columbus as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2006.

Queue IDP44
Project nameColumbus Floodwall
Status (as published)In Service
SubstationCity of Columbus
Point of interconnectionCity of Columbus
CountyFranklin
StateOH
VoltageNot reported
Capacity7 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Target commercial operation2006-12-31
Source datasetserial

Same substation and county

City of Columbus substation: 3 requests in the PJM queue, 1 active totaling 7 MW.

Queue IDProjectMWResourceStatus
Q30City of Columbus0GasWithdrawn
W3-127City of Columbus 14.4kV0OtherWithdrawn

Franklin, OH: 20 requests in the PJM queue, 5 active totaling 218 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy7.47
MW capacity7
MFO7.47

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.