Harvey Solar I
PJM queue ID AG1-034
Harvey Solar I (AG1-034) is listed in the PJM interconnection queue as a 53.6 MW solar project in Licking County, OH. The filing names Centerburg as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of January 15, 2029.
| Queue ID | AG1-034 |
|---|---|
| Project name | Harvey Solar I |
| Status (as published) | Engineering and Procurement |
| Substation | Centerburg |
| Point of interconnection | Centerburg 138 kV |
| County | Licking |
| State | OH |
| Voltage | 138 kV |
| Capacity | 53.6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-01-15 |
| Source dataset | serial |
Same substation and county
Centerburg substation: 6 requests in the PJM queue, 3 active totaling 146.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-067 | Harvey Solar I | 57 | Solar | Engineering and Procurement |
| AG1-024 | Harvey Solar I | 35.7 | Solar | Engineering and Procurement |
| AI2-088 | Centerburg 138 kV | 229.6 | Solar | Withdrawn |
| AH1-036 | Centerburg 138 kV | 100 | Battery | Withdrawn |
| AE2-073 | Centerburg 138kV | 21 | Solar | Withdrawn |
Licking, OH: 23 requests in the PJM queue, 8 active totaling 1,039.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 127.5 |
| MW capacity | 53.55 |
| MFO | 362.5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.