Harvey Solar I (AG1-024) is listed in the PJM interconnection queue as a 35.7 MW solar project in Licking County, OH. The filing names Centerburg as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of January 15, 2029.

Queue IDAG1-024
Project nameHarvey Solar I
Status (as published)Engineering and Procurement
SubstationCenterburg
Point of interconnectionCenterburg 138 kV
CountyLicking
StateOH
Voltage138 kV
Capacity35.7 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-01-15
Source datasetserial

Same substation and county

Centerburg substation: 6 requests in the PJM queue, 3 active totaling 146.3 MW.

Queue IDProjectMWResourceStatus
AD2-067Harvey Solar I57SolarEngineering and Procurement
AG1-034Harvey Solar I53.6SolarEngineering and Procurement
AI2-088Centerburg 138 kV229.6SolarWithdrawn
AH1-036Centerburg 138 kV100BatteryWithdrawn
AE2-073Centerburg 138kV21SolarWithdrawn

Licking, OH: 23 requests in the PJM queue, 8 active totaling 1,039.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy85
MW capacity35.7
MFO235

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first