Biggs Ford Solar Facility
PJM queue ID AB1-125
Biggs Ford Solar Facility (AB1-125) is listed in the PJM interconnection queue as a 5.7 MW solar project in Frederick County, MD. The filing names Carroll-Monocacy as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 1, 2025.
| Queue ID | AB1-125 |
|---|---|
| Project name | Biggs Ford Solar Facility |
| Status (as published) | In Service |
| Substation | Carroll-Monocacy |
| Point of interconnection | Carroll-Monocacy 34.5kV |
| County | Frederick |
| State | MD |
| Voltage | 34.5 kV |
| Capacity | 5.7 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2025-09-01 |
| Source dataset | serial |
Same substation and county
Carroll-Monocacy substation: 2 requests in the PJM queue, 2 active totaling 13.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB1-124 | Legore Bridge Solar Center Facility | 7.6 | Solar | In Service |
Frederick, MD: 34 requests in the PJM queue, 8 active totaling 923.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 15 |
| MW capacity | 5.7 |
| MFO | 15 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.